Product name:
manufacturing shuttering jacks used frame scaffolding scaffolding steel prop for building house

FAQ1)How manys days can you delivery after confirmed the order?
From stock ,we can shipping within 5-7 days.
For customized of common size, will be delivery in 30 days.
and for specially sizes need to negotiate.
2) What's your payment?
1. 30%TT as deposit, 70% balance against the copy of BL.
2. 100% LC at sight /45 days or 60 days LC
3)What's the product's warranty ?
As long as you received our cargo within 1 years, if you have any problem, pls feedback to us.
After confirmed our quality cause, we will resend new pipes or give reasonable compensation for you.
4) Can I have a trail order ?
Of course, we are gald to make a trail order to show our quality and service.
Getting your satification, we can try more cooperation .
5) Can I have a vist ?
Welcome your visiting ,we can communicate and exchange market information to develop more business.
Place of Origin | Tianjin China (Mainland) | ||||
Size | more customized size available) | ||||
Length (mm) | 1000mm 1500mm 2000mm 2500mm 3000mm 4000mm | ||||
Width(mm) | 210mm | 240mm | 300mm | 420mm | 480mmm/500mm |
Height(mm) | 38mm | 45mm | 50mm | ||
Thickness(mm) | 1.0mm | 1.1mm | 1.2mm | 1.5mm | 1.8mm/2.0mm |
Material | Q195-Q235 | ||||
Surface Finishing | pre-galvanized (Zinc Coating: 30-60 g/square meter) | ||||
Technique | automatic productive assembly line | ||||
MOQ(Minimum Order Quantity) | 500pcs | ||||
Payment | T/T 30% as deposit, banlace before loading; or L/C at sight | ||||
Package | packed in bulk or in bundle. shipped by container or as client's request | ||||
Production Capacity | 200,000 pcs/month |

Applications of scaffolding planks in construction: | |||
1.Scaffolding plank is the main parts of scaffolding system which is convenient for workers to walk on high building. | |||
2.Stamping holes are on the scaffolding plank to resist skidding for workers. | |||
3.The galvanized surface makes scaffolding plank more stronger in the rainy days and most environment. | |||
4. Various size of scaffolding plank could be customed. |

Advantage of scaffolding planks used for construction: | |||
1.durable & stable | |||
2.good bearing capacity | |||
3.low cost, high quality | |||
4.Excellent security function | |||
5.easy to assemble & dismantle | |||
6.long durability, the working life can up to 5-8 years | |||
7.Corrode-resistant, Slip prevention, Anti-fire, Anti-sand, less weight |

Tianjin Jinxinbao Mental Surface Treatment Co.,LTD. (Headquarters) Founded in 2012
Tianjin Baojing New Energy Technology Co.,LTD. Founded in 2016
Tianjin Shengteng Internatinal Trading Co.,LTD. Founded in 2018
with the location at the largest welded pipe production based in china-Yangjiayuan Town,Tianjin.
Which is the most professional manufactuer of steel products in this area.
We have total 6 galvanized production lines,
and about 200 employees, annual production more than 200000 tons.


ON SALES→ | ON SALES→ |
ON SALES→ | ON SALES→ |

We can provide all kinds of customized products and sucessful supply for many PV projects.
especially including galvanized steel pipe ,
square and rectangular steel tube,
seamless steel pipe ,
ERW steel pipe,
galvanized steel coil/sheets ,
scaffolding steel props,
PV mounting system .
We will more fouce on the quality and improve the service to thankful each client in the future.